LONG LEAD CONSTRUCTION PRIVATE LIMITED

U74999MH2019PTC334348
Active Private Unlisted

About LONG LEAD CONSTRUCTION PRIVATE LIMITED

LONG LEAD CONSTRUCTION PRIVATE LIMITED is a Private company registered in Maharashtra, India. The company was incorporated on 12 December 2019 with Corporate Identification Number (CIN) U74999MH2019PTC334348 and is currently Active. It is registered at the Registrar of Companies (RoC) office in ROC Mumbai.

LONG LEAD CONSTRUCTION PRIVATE LIMITED has an authorized share capital of Rs 1.00 L and a paid-up capital of Rs 1.00 L. The company operates in the Business Services sector (NIC Code: 74999). It is classified as a Company limited by shares and categorised as a Non-government company.

The registered office of LONG LEAD CONSTRUCTION PRIVATE LIMITED is located at ZENIA BLDG. 4 TH FLOOR HIRANANDANI ESTATE,G.B. THANE,Thane,Thane,Maharashtra,400607-India.

Company Overview

Registration Date
ROC Code
Category
Company limited by shares
Sub Category
Non-government company
Company Origin
Indian

Capital Structure

Authorized Capital
Rs 1.00 L
Paid-up Capital
Rs 1.00 L

Industry Classification

NIC Code
74999

GST Registrations Fetching...

Registered Office Address

ZENIA BLDG. 4 TH FLOOR HIRANANDANI ESTATE,G.B. THANE,Thane,Thane,Maharashtra,400607-India

Directors Loading...

Director information will be loaded automatically.

Frequently Asked Questions

What is the CIN of LONG LEAD CONSTRUCTION PRIVATE LIMITED?

The Corporate Identification Number (CIN) of LONG LEAD CONSTRUCTION PRIVATE LIMITED is U74999MH2019PTC334348. This is a unique 21-character alphanumeric identifier assigned by the Registrar of Companies (RoC) at the time of incorporation.

When was LONG LEAD CONSTRUCTION PRIVATE LIMITED incorporated?

LONG LEAD CONSTRUCTION PRIVATE LIMITED was incorporated on 12 December 2019 as a Private company in Maharashtra, India.

What is the current status of LONG LEAD CONSTRUCTION PRIVATE LIMITED?

LONG LEAD CONSTRUCTION PRIVATE LIMITED is currently Active. This means the company is operational and in compliance with regulatory requirements under the Ministry of Corporate Affairs (MCA).

What is the authorized capital of LONG LEAD CONSTRUCTION PRIVATE LIMITED?

LONG LEAD CONSTRUCTION PRIVATE LIMITED has an authorized capital of Rs 1.00 L and a paid-up capital of Rs 1.00 L. The authorized capital is the maximum amount of share capital the company can issue, while paid-up capital is the amount actually paid by shareholders.

What industry does LONG LEAD CONSTRUCTION PRIVATE LIMITED operate in?

LONG LEAD CONSTRUCTION PRIVATE LIMITED operates in the Business Services sector, classified under NIC Code 74999. This classification is based on the National Industrial Classification system used by the Ministry of Corporate Affairs.